Well, since the last time I wrote, things have been really crazy. I had talked to Jamie just before writing that blog and she seemed happy and confident that John would pull through. However, he took a serious turn for the worse that afternoon and died about 6:30 that evening. I think I was one of the first people to hear about it, and it was a big shock. Imagine us sitting down to dinner and praying for John's recovery, only to get a call five minutes later that he had died. I think I've cried more in the past couple of days than I have in a long time. Maybe that means my cry-quota has been filled and I won't have to do it anymore for a while, but with the funeral tomorrow I doubt that will happen. I'll be in the kitchen helping with the dinner tomorrow, which means I'll be around the funeral-stuff from around 10 am till after we clean up the dinner, whenever that is.
On a much lighter but still frustrating note, I was going to write about the other things that have been happening the last week or so. Last Friday was a rainy day; it rained outside, and it also rained inside. You might ask yourself how it could possibly rain in our apartment when we live on the first floor? The answer is that the connection between the water pipe and the hot water heater on the second floor burst at about 9:30 in the morning. All the water from the tank and more water from the pipe came down into our apartment, specifically Karen's room (closet actually) and the front bathroom, with some spillage in the 'hallway' between the kitchen and living room. Water came through the heater-vents, the bathroom exhaust fan, and the walls. Luckily it was during the office hours and the maintenance guys got here quick to help me move our stuff out of the way. Most of the stuff in the closet was in plastic tubs-the stuff that we don't have room for in our apartment, Karen's too-small clothes, and stuff like that. Most of the furniture had no problems or only slight water damage on the bottom where the water tried to get at it. They had a carpet guy come in and take out the soaking-wet pad under the carpet and bring in a giant fan to dry out the floor/carpet.
Saturday we worked on getting the carpets dry and monitoring the water spots that appeared in the ceiling.
Sunday we got up and went to church. When we got home, we noticed that the ceiling in Karen's room was sagging more than it had been, right near the water spots. We called our home teacher to help us move all the stuff that was still in the room in case the ceiling fell or something. During the night it did start to drip-noisily.
Monday they said a guy was going to come and open a hole in the ceiling to make sure it was getting dry in there. It wasn't dripping as much as it had been, but the nasty wet smell when they opened it up said there was or had been quite a bit of water up there. It was also worrysome that he cut through the sheetrock like it was butter. Note: at this point we have Karen's crib, bunkbeds, and lots of other 'junk' just sitting around our living room, leaving us almost no room to 'live' in, since it was still wet feeling/smelling in Karen's room.
Tuesday they checked on the hole, made it a little bigger, and that was it. Wednesday they patched the hole. To do this took an interesting process, since the rest of the ceiling around the hole is sagging quite severely. First, they put in some shims (little wooden wedges usually used for things like getting doorframes or other construction works up just a bit if the floor isn't exactly level.) to bring the level of the ceiling there a little lower. Then they screwed the piece of sheetrock into the pile of shims. After that it still wasn't quite low enough, so they put a very thick layer of 'mud' on it to make it more or less level with the rest of the ceiling. They're going to have someone come next week to make it more invisible by putting the 'popcorn' looking stuff on it and then paint that little portion of ceiling.
Thursday they came back to inspect their very poor handywork. They said it was 'fixed' and we should move all the stuff back into the bedroom; the guy will put cloths or plastic down when he paints next week. One of the sets of sister missionaries also came over to help wash all the construction dust off the walls. It was helpful in that it would have taken me three or four times as long to do the work, but it was during nap time and Karen woke up early and was somewhat beastly all afternoon. After Joe got out of class at 7 pm, we started moving things back in. We'd called our home teacher to help us move it all back, and after going to an appointment with the Elders, the three of them came and helped put the bunk beds back together (actually we only put the top bunk back together; it has rails on it so Karen can sleep in it sooner than the bottom bunk because it has a place where she can get out, but it would be difficult for her to fall out of bed. By 9 pm we had most of the stuff back into the room, and Karen could finally go to bed. It was a long day, but I got my house back together.
So, in addition to everything that's been going on in the ward the past week or so, we had a domestic disaster as well. What I'm thankful for is that now it's mostly over and we can start getting back to normal, whatever that really means. We're all safe and healthy, if a bit exhausted from the past week, and we're looking forward to next week being much more calm (or at least no more crazy than this week was!!!) After we finally get around to putting all our flood pictures on the computer I'll put a couple up here so you can all see-that's one thing on the list for next week!!
Highlights of our time in PTC
12 hours ago
